MECA Solution

MECA Solution Sdn Bhd

IOT Solutions and Services

MECA Solution has been established as a service and solution provider for the diversified automation control industries that involved in control system design, SCADA and telemetry system.

To remain continually innovative and growing through the challenges in order to bring more value to our customers and manufacturing partners, we will maintain a beginner's mind.

We believe that in beginner's mind, there are many possibilities, but in the expert's there are few.

Services

  • Conventional control system design & development
  • Remote control system design & development
  • PLC & SCADA migration
  • Electrical control panel design and fabrication
  • Site installation and supervision
  • Product and application training
  • System maintenance and troubleshooting
  • IOT

Projects

Alliance Rubber Waste Water Treatment Plant

Project Period: Jun 2010To design and develop the SIEMENS LOGO PLC program for the wastewater treatment plant and perform T&C for the PLC program. more...

Desmet Kias Refinery Plant (Indonesia)

Project Period: Jul 2010 - May 2011To develop and test the Siemens S7-400 PLC program and Wonderware SCADA for Kias Refinery System testing and commissioning. O&M preparation for the System. more...

Desmet Kias Fractionation Plant

Project Period: Apr 2011 – May 2011To perform loop test and program troubleshooting for Kias Fractionation System. more...

Desmet Olympia Refinery Plant

Project Period: Aug 2010 – Sept 2010To integrate and develop the Siemens S7 PLC program for Olympia Refinery Plant. more...

Toray Boiler System PLC/HMI to DCS Integration

Project Period: February 2016 – April 2016To design and develop PLC and HMI program for Industrial Boiler System including- on site system testing and commissioning.- DCS communication for data controlling and monitoring integration more...

Future Prelude Additional Cabling Work

Project Period: Aug 2010 – Sept 2018To supply and install cables for new control panels. Testing and Terminate instruments signal point for the control panels. more...

Infineon Exhaust Lateral Monitoring Project

Project Period: Oct 2010 – Mar 2011To design and develop Siemens S7 PLC program and Siemens WinCC Flexible program for the Infineon exhaust lateral monitoring panels. T&C for the programs and panels. O&M preparation for the System. more...

Qcell Additional Exhaust Fans Project

Project Period: Nov 2010 – Dec 2010To apply safe work permit, method of statements and monitor cabling work of sub con. Assist Company Chargeman to install new control device in the panels for the additional fans. T&C for the Control panels and terminate all the control signal cables during Qcell shutdown session. more...

Infineon H2 Dilution System

Project Period: Dec 2010 – Apr 2011To design and develop Siemens S7-300 PLC program and Siemens WinCC SCADA program for Infineon hydrogen dilution system. T&C for the control panel and all the instruments. O&M preparation for the System. more...

Gardenia Makeup System Service Job

Project Period: Dec 2010To troubleshoot and modify the Allen Bradley PLC program and Wonderware SCADA for Kota Kemuning Gardenia bakery Factory. more...

Baker’s Maison

Project Period: Nov 2010 - Jan 2011To study and develop the Allen Bradley 500 PLC program and Wonderware SCADA for Bakery Maison Panel. more...

Sg Sok & Sg Renyok Minihydro Plant Monitoring System

Project Period: Aug 2011 - Dec 2011To implement, testing and commissioning the Minihydro Plant SCADA Monitoring System with control panel, ABB PLC and PCVue SCADA program.- Communicate site analysis controller to SCADA by using MOXA Modbus communication. more...

KL Hospital Substation 8 Upgrade system

Project Period: Otc 2011 - Nov 2011To upgrade, testing and commissioning the substation 8 new circuit breaker monitoring system with Schneider twido PLC and MOXA Nport.- To modify PCVue SCADA program and mimic by adding new signals monitoring.- To prepare Operation and Maintenance Manual for the system. more...

Top Glove F12 SCADA system upgrade

Project Period: Jan 2018 – Dec 2018- Genset SCADA integration for block A and block B- Auto stacking SCADA integration for block A- Former counter SCADA integration for block B more...

Top Glove F4 SCADA system upgrade

Project Period: Jan 2018 – Dec 2018To continue improve on the existing SCADA system- Process Temperature integration for Block B- Existing SCADA system service and troubleshooting for Block A more...

Top Glove M26 SCADA & Machine Upgrade

Project Period: Jan 2018 – Dec 2018To continue improve on the existing SCADA system- Process Temperature integration for Block B- Existing SCADA system service and troubleshooting for Block A more...

Contact Us

Operation Hour

8:30am - 5:30pm, Monday - Friday

Phone Number

+603-6734 0505